Euronaut picture update 8.8.2004 585 - Flowmeter for Gasflow control of the divers-Rebreather and Oxygen flow of the L.S.S. 586 - Docking station of Oxygen Messure indicator (in percent of Atmosphere) inside the sub, 590 - One of the two sub internal crane heads 591 - The main gear premilary in place with foundation for Diesel and electric drive 592 - Still some steel work on the main shaft entrance and cleaning the shaft inside 593 - new steel work on the foundation of the second compressor 594 - Mockup of the main gear shaft ball bearing casing aft the main gear 597 - One high pressure valve panel under construction 599 - High pressure valve panel aft side, 45 degree config.to safe space. regards Carsten